Room-level energy metering is only useful if three choices are made before installation: which circuits sit inside the meter boundary, whether the meter resolution can see the loads you care about, and what baseline the readings will be compared against. A hotel that meters without a baseline gets a number per room and no way to tell whether it is good.
This reference is written by Singapore-based AV and IPTV integrator Prestige Solutions for hotel facility managers, chief engineers and consultants who are planning energy reporting on top of a smart room control system. It covers metering boundaries, a resolution and range check using the power detection module on the product page, a method for a baseline in kWh per occupied room-night, and the data faults to expect. Module figures are taken from the product page as of 2026; confirm them against the current datasheet before design.
Meter the circuits the room controller can influence: air-conditioning, lighting and switched sockets. Leave out circuits it cannot influence, such as the minibar and the in-room safe, or record them as a known fixed load, so the saving that the controls produce is not buried in loads the controls never touch.
| Boundary option | What it captures | Strength | Limit |
|---|---|---|---|
| Whole room (incoming room supply) | Every load in the room | One meter per room, simple to install and audit | Fixed loads mask the controllable part; needs the room load to fit the meter range |
| Air-conditioning circuit only | Fan-coil unit and its valve and fan | Shows the setback effect directly, since air-conditioning is usually the largest controllable load | Lighting and socket savings are not seen |
| Air-conditioning plus lighting plus switched sockets | All loads the room controller switches | Matches what the control logic changes | Needs correct circuit separation in the distribution board |
| Sub-metering by circuit | Each circuit on its own channel | Best for diagnosis and for proving a single setting | More modules, more points to commission and maintain |
For a first deployment, the whole-room option gives the lowest cost and the simplest reading, and the air-conditioning-only option gives the clearest evidence of what the controller is doing. Decide based on the question the hotel wants answered: total consumption per room, or the effect of a specific control setting.
The power detection module on the Smart Room Control page measures up to 4000 W at 0.1 kWh resolution. On a 230 V single-phase supply, which is the usual low-voltage supply in Singapore, 4000 W corresponds to a current of 4000 / 230 = about 17.4 A. A room that can draw more than that needs its load split across more than one meter or a different metering approach.
| Check | Calculation | Result |
|---|---|---|
| Current at the module limit | 4000 W / 230 V | About 17.4 A |
| Air-conditioning module at its 2000 W total rating (product page, as of 2026) | 2000 W / 230 V | About 8.7 A |
| Typical worst case to design for | Sum of nameplate loads on the metered circuits, not the average | Compare with 4000 W; if it exceeds, split the loads |
| A suite with two fan-coil units and a heavy lighting load | Add the nameplate loads of both circuits and lighting | Often above 4000 W, so meter by circuit |
Design to the nameplate sum, because an energy meter that clips at its limit silently under-reports at the peak. A kettle, hair dryer or a steam appliance on a switched socket can add to the room load for a few minutes.

A resolution of 0.1 kWh means the reading moves in steps of 100 Wh. It shows daily and hourly patterns of loads in the hundreds of watts, and it cannot show a small standby load changing from one minute to the next. Treat the reading as a counter, not a power trace.
| Load and period | Energy | Steps of 0.1 kWh | What you can conclude |
|---|---|---|---|
| 40 W standby load for 24 hours | 0.96 kWh | About 10 | Visible as a daily total, not as a minute-by-minute trend |
| 150 W average for 24 hours | 3.6 kWh | 36 | A change of 10% is about 3 or 4 steps, enough for daily comparisons |
| 800 W fan-coil unit running 1 hour | 0.8 kWh | 8 | Visible within the hour |
| 5 W change for 24 hours | 0.12 kWh | About 1 | Not distinguishable from rounding on a single day |
The practical rule: compare days or weeks, not minutes, and average across enough rooms that rounding stays small. If the hotel wants to see a setback event as it happens, the controller's own state log, as described in the guestroom occupancy sensing logic note, is a better evidence source than the meter.
Divide the metered energy by the number of occupied room-nights, using room status from the property management system, and compare like with like. The metric must separate occupied nights from vacant nights, otherwise a high-occupancy week looks worse than a low-occupancy week and the control effect cannot be seen.
The table shows the structure of the calculation with assumed figures only. Replace them with the hotel's own readings.
| Item | Assumed baseline | Assumed with controls |
|---|---|---|
| Metered energy, one room type, one month | 1,200 kWh | Hotel's own reading |
| Occupied room-nights | 20 | Hotel's own count |
| Vacant room-nights | 10 | Hotel's own count |
| Result structure | kWh per occupied room-night and kWh per vacant room-night, separately | Same two figures, same room type |
These numbers are illustrative inputs for the method and are not a claim about any hotel's savings. The planning for a savings estimate and payback is a separate exercise that uses the hotel's own utility tariff and measured baseline.

Most reporting faults are boundary, clock or communication problems, not meter faults. The table lists the ones to check when a room's figure looks wrong.
| Symptom | Likely cause | First check |
|---|---|---|
| Room reads zero for several days | Meter or gateway offline, or the room is out of order | Controller connection status and room status in the PMS |
| Reading jumps by a large step | Communication loss followed by catch-up | Event log for gaps; mark the day as incomplete rather than averaging it |
| One room consistently higher than its twins | Different circuit wiring, a fixed load on the metered circuit or a faulty fan-coil unit | Circuit schedule and a sub-metered check |
| Daily totals do not match the night audit date | Meter day boundary differs from the PMS business date | Reading time and PMS date setting |
| Reading falls after a firmware change | Setting reset or a changed measurement interval | Configuration comparison against the baseline file |
| Readings over the limit are flat | Load above the module range, so values clip | Nameplate sum against the module limit |
Changes to firmware or configuration can alter measurement settings, so energy reporting should be part of the update routine described in the guestroom controller firmware rollout note.
A room passes when its meter reading agrees with a known test load within the tolerance agreed in the scope document. Test every room type, and test enough rooms per floor to catch wiring differences.

A sample can answer a design question, but reporting for a whole property needs a meter in every room, or a defined set of room types with sufficient numbers in each. Whether to meter all rooms is a cost and reporting decision. Start with each room type and each floor orientation represented, then extend if the data shows large variation.
Treat these readings as management information. Billing needs meters that meet the applicable metering approval and accuracy requirements, which are a regulatory matter outside this note. Check the requirement with the utility or the licensed electrical contractor before using any reading for billing.
Four weeks is a practical minimum, because it covers weekday and weekend patterns and some change in occupancy. A longer baseline that includes a different season gives a better weather comparison. Whatever the length, keep the calculation method fixed so the before and after figures remain comparable.
Visit Prestige Solutions for the wider AV and IPTV service range.
Contact Prestige Solutions to review your site drawings and current operating pattern. Call +65 8010 2337 or +65 9825 8218, message us on WhatsApp (+65 8010 2337), or email sales@prestigesolutions.com.sg. You can also browse the full product range before the site walk.
Explore our full product range or speak with our technical team for a tailored consultation.